Belzig District Hospital, Construction Stages 1-3

1st construction stage (1998-2000)

The first construction stage for Belzig hospital was carried out over two years as part of the planned overall refurbishment. In addition to important extension buildings for the examination and treatment area, it included an extension of the existing ward, various reorganizations of technical centers, and a helipad with direct connection to the newly constructed operation, IC, and emergency admissions departments. All measures were carried out while the hospital remained in full operation.

2nd construction stage (2000-2003)

Refurbishment and reconstruction of the central existing structures and of the east ward as a complementary building. Three stations with 36 beds each and one station with 29 beds were completed with modern rooms and sanitary units. The new staff dining room on the ground floor is designed as a multi-purpose hall. On the basement level, the physical therapy area has been expanded with various massage and therapy offerings. The old "complementary building" was originally the only area for examination and treatment. During the second construction phase, all four levels have been reorganized and effectively linked with the adjacent functional areas from the first construction phase. New rooms for childbirth, sterile supply, an additional operating room, and the clinical medical service for surgery complete the offerings. Other work on the refurbishment measures included the improvement and qualification of structural fire prevention, as well as heat and sound insulation. A major solar energy system was erected on the roof of the east wing, making a major contribution to reducing the hospital's carbon footprint.

3rd construction stage (2004-2006)

Refurbishment of the west wing. The construction activities are largely equivalent to those in the east wing from the 2nd construction stage. A two-story extension building for medical services / patient lounge. The third construction stage completes the refurbishment of the existing building that was begun in the second construction stage. All fire protection requirements are fulfilled through construction measures. The construction was carried out while the hospital remained in full operation.

Architect / ordering party

TMK Architekten Berlin

Builder

Kreiskrankenhaus Belzig GmbH

 

Projektleistungen

1st-2nd construction stages

Project parameters

Gross floor area:
30,940 m²
Building sum: EUR 36 million
Planning
start: 1998
Completion: 2003

Planning services

Technical equipment EG 1-4

  • Preliminary planning
  • Design planning
  • License planning
  • Execution planning
  • Preparation for tendering
  • Participation in tendering
  • Object monitoring
  • Object servicing

Structure planning

  • Preliminary planning
  • Design planning
  • License planning
  • Execution planning
  • Preparation for tendering
  • Object monitoring

3rd construction stage

Project parameters

Gross floor area:
3,851 m²
Building sum: EUR 7.1 million
Planning
start: 2004
Completion: 2006

Planning services

Technical equipment EG 1-6

  • Preliminary planning
  • Design planning
  • License planning
  • Execution planning
  • Preparation for tendering
  • Participation in tendering
  • Object monitoring
  • Object servicing

Structure planning

  • Preliminary planning
  • Design planning
  • License planning
  • Execution planning
  • Preparation for tendering
  • Object monitoring