A separate parking level was planned and constructed in addition to the existing helipad. This created a place for an additional helicopter to land. GTB rendered all services for building technology in equipment group 1 - gas, water, sewage, and fire extinguishing technology, as well as equipment group 3 - electrical technology. The structure planning rendered by GTB included a precise examination of the existing situation to include unplanned additional loads, as well as calculation and design of the steel construction for the parking level.
Trägerverein Unfallkrankenhaus Berlin UKB with berufsgenossenschaftlicher Unfallklinik e.V.
|