Berlin emergency hospital - House 5

Remodeling and refurbishment (2004-2006)

House 5 from the former premises of the Greisinger hospital will be remodeled as a ward for the neurology department of the emergency hospital. The vast majority of the technical equipment in House 5, including its design, is from pre-unification days. Various local renovations and modifications have been made since 1989. However, there was no general overhaul of the equipment. GTB developed a refurbishment concept for the heating, sanitary, and ventilation technology. The existing systems were included and continued to be used, whenever possible.

Builder

Trägerverein Unfallkrankenhaus Berlin UKB with berufsgenossenschaftlicher Unfallklinik e.V.

Architect / ordering party

Karl Schmucker + Partner Planungsgesellschaft mbH

Client

IG HT Ingenieurgemeinschaft Haustechnik, Ingenieurbüro Komaschewski

Projektleistungen

Planning services

Technical equipment EG 1, 2, 6

  • Preliminary planning
  • Design planning
  • License planning
  • Execution planning
  • Preparation for tendering
  • Participation in tendering
  • Object monitoring

Project parameters

Gross floor area:
4,800 m²
Building sum TE:
EUR 380,000
Planning
start: 2004
Completion: 2006