Berlin-Chemie AG, Berlin Adlershof Power Station

Packaging & supply logistics

(2001 - 2002)

Technical equipment of a production building for packaging solids

  • Ventilation, air conditioning, and instrumentation and control technology for 2,740 m² gross floor area (packaging area with clean room class D in accordance with GMP)
  • High-pressure air, vacuum, and dedusting systems for supplying twelve packaging lines
  • Sanitary, heating, ventilation, cooling, high-voltage and low-voltage electrical technology for the packaging area, as well as for office and staff rooms

Technical equipment of a power station

  • High-voltage transformer system 2 x 1,600 kVA with low voltage switchgear
  • Oil-free high-pressure air generation system 2,000 m³/h (N) / 10 bar with cooling
  • Sanitary and ventilation equipment

Builder / ordering party

Berlin-Chemie AG

Projektleistungen

Planning services

Technical equipment EG 1-6

  • Preliminary planning
  • Design planning
  • Preparation for tendering
  • Participation in tendering

Project parameters

Gross floor area:
4,250 m²
Building sum
TE: EUR 2.16 million
Planning
start: 2001
Completion: 2002